FounderWiseDecisions, not feeds
← All articles FounderWise · Long-form

What goes in the contract and what does not

A contract can only hold what somebody could verify in a dispute. Everything else is held by the relationship, which is a real mechanism with a real failure mode, and the clause you omit today is the one you cannot add in year two.

24 Nov 2026 13 min read By Joshua Pi’Rwot
Share X LinkedIn

The agreement is nearly done. Your lawyer wants three more clauses, the counterparty is impatient, and everyone keeps saying that if it gets to the contract the relationship has already failed.

That last sentence is true and it is being used to decide the wrong thing. A contract cannot hold most of what matters here, and the clauses you drop today are the ones you will be unable to raise in eighteen months.

Why these three models

The decision is what to write down and what to leave to the working relationship. The features that fire are a set of obligations that differ sharply in whether anyone could verify them, a document whose omissions become permanent, and a failure that arrives long after the signature and provokes an overcorrection.

Three lenses. Mechanism design produces an equilibrium answer about what a contract can enforce at all. Path dependence produces a cycle answer about why what you leave out stays out. Delay produces a complex answer about why companies swing between handshakes and forty-page agreements. The first bounds the exercise and the third explains why nobody lands in the middle.

1. A contract holds only what is verifiable

Start with the constraint, because it is narrower than most drafting conversations assume.

An enforceable term has to rest on something a third party could observe and verify. Delivery by a date, a payment amount, a stated uptime, a defined scope, a named deliverable: all verifiable. Best efforts, good faith, reasonable support, strategic alignment and a genuine commitment to the partnership are not, and a clause built on an unverifiable quantity is decoration.1

That is not an argument for shorter contracts. It is an instruction about which arguments to have. Negotiating hard over a best-efforts clause spends goodwill on a term that will not decide anything, while the definition of what counts as delivered, which will decide everything, goes through unexamined because it looks administrative.

Fight over the definitions and let them have the adjectives.

Applied practically, three categories are worth the effort every time. What triggers a payment, stated as an observable event rather than as satisfaction. What counts as a breach, and what happens next, because a remedy that is not specified is not a remedy. And what each party may do unilaterally, which is the term everyone assumes is obvious and nobody agrees on later.

Make the delivery definition concrete, because that is where the disputes actually live. In a distributor agreement, delivered can mean dispatched from your warehouse, signed for at theirs, or accepted after a count against the invoice. Those are three different dates, and they put the loss on a short shipment in three different places. Pick one, name who signs, and say what happens when the count disagrees. Apply the same discipline to payment: funds received in the account, not payment initiated, because a mobile money transfer sent on Friday afternoon and settled on Monday moves the date and the risk along with it.

Everything else is held by the relationship, and that is a real mechanism rather than a hope. A counterparty who expects a long and valuable future behaves well without a clause, because the future is worth more than the one-off gain from behaving badly.4 What that mechanism cannot do is survive the moment their horizon shortens, which is exactly when you need it, so it should never be carrying anything that would be fatal.

Since the relationship is doing that enforcing, watch for the horizon shortening, because it is visible before the behaviour changes. A counterparty being acquired, one who has lost the person who championed you internally, one who has just started a line of business that competes with yours, or one who has stopped putting people on the joint work is a counterparty whose future with you is worth less than it was last quarter. Any one of those is the moment to move something out of the relationship column and into writing, at the next renewal, while the request is still ordinary.

2. What you leave out hardens

The second lens explains why the omissions matter more than the inclusions.

Every term you do not raise now becomes progressively harder to introduce. In the first negotiation, an unusual clause is a normal request. In year two it is a signal of distrust that requires a reason, and producing a reason means naming a concern about a partner you are currently working with. The cost of raising it rises continuously and nobody is watching that clock.2

So the drafting question is not what do we need, it is what will be impossible to add later. Those are different lists and the second is shorter and more valuable.

The items that reliably belong on it are the structural ones rather than the commercial ones. Data ownership and access. Whether the customer relationship is yours or theirs. Termination rights and what happens to work in progress. Whether they may serve a competitor, or you may serve theirs. Rights of first refusal, which are cheap to refuse now and impossible to remove once granted.

None of those is about distrust and all of them read as distrust in year two, which is precisely the asymmetry to exploit while the drafting is still ordinary. The framing that works is not we might fall out, it is we should write down how this works while it is easy, and it is accepted much more often than founders expect because the other side has the same problem.

If the counterparty will not accept a structural clause, do not abandon it, shorten its reach. Exclusivity you cannot get outright can become a notice period before they take on a competitor. A data ownership term they will not sign can become a right to export your own data in a stated format within thirty days of a request. Both are smaller than what you asked for and both preserve your ability to act, which is the part you were buying. A refused clause that turns into a notice period is a much better outcome than a refused clause that turns into silence.

One distinction is worth keeping sharp here. Some structural terms are useful in weakened form and some are worthless unless whole. A notice period is useful. Termination for convenience is not, because a right to leave that requires the other side’s agreement is not a right. Where the weakened version does not preserve your ability to act unilaterally, do not take it as a compromise. It will be read later as the matter having been settled, and it closes the subject for the life of the agreement.

The reverse also holds and is worth saying. A term you include and never use costs nothing. A term you omit and need is not available at any price. That asymmetry argues for erring toward inclusion on structural terms specifically, and it does not argue for a longer contract in general, because length is where the next lens applies.

3. The correction always arrives late and too hard

The third lens explains the pattern most companies actually exhibit, which is neither of the two positions people argue for.

Contract failures surface long after signature. A scope dispute appears in month nine, a data question in year two, a termination problem at the end. By the time the gap is visible, the decision that produced it is a year old and the people who made it have moved on.

A system with a long delay between action and consequence does not respond smoothly, it overshoots.3 The organisational version is recognisable. A company operates on light agreements, gets hurt once, and responds by requiring a comprehensive contract for everything including the smallest supplier. That slows every deal, is quietly circumvented within a year, and the circumvention becomes the new normal until the next incident.

The remedy is the same as for any lagged loop: measure closer to where the state changes rather than reacting harder when the outcome arrives. Practically, that means reviewing the agreements that did not fail, not only the one that did. Once a year, take three live contracts and ask what would happen under two specific stresses: they stop performing, and they get acquired. That surfaces the gaps while nothing is wrong and while adding a clause at renewal is still routine.

That review has a cheaper version for a company that will not run one. Attach the two stresses to renewal rather than to a calendar date. Every agreement comes up for renewal eventually, somebody has to send that email, and adding two questions to it costs ten minutes. It is worse than an annual pass, because a three-year term then sits unexamined for three years, and it is far better than a review nobody ever schedules.

And size the response to an incident deliberately, because the instinct after a bad experience is to add the clause that would have prevented it to every future agreement. That is a correction sized as though the delay were zero, and it is how a company ends up with a template nobody can sign.

The overcorrection also has a cost that lands on somebody other than whoever ordered it. When the template hardens after an incident, the deals that quietly die are the small ones, because a supplier doing modest business will not pay a lawyer to review forty pages and simply stops replying. Nobody reports that as a consequence of the new template. So count how many small agreements were signed in the six months before and the six months after you tightened it. A sharp drop is the circumvention starting, and it is easier to correct in month three than in year two.

What the three say together

  • Spend the negotiation on definitions and remedies, not on adjectives. Only verifiable terms enforce anything.
  • Ask what will be impossible to add later, and include those now: data, customer ownership, termination, exclusivity, rights of first refusal.
  • Never let the relationship carry a term whose failure would be fatal. It works until their horizon shortens, which is exactly when you need it.
  • Review three live agreements a year against two stresses: they stop performing, they get acquired.

Where they disagree

The enforceability argument and the omission argument recommend opposite lengths.

Mechanism design says write less. Most of what people want to include is unenforceable, a long document creates an illusion of protection, and the effort spent drafting it would be better spent on the four terms that actually bind.

Path dependence says write more, specifically on structure, because the cost of an omission compounds and the cost of an unused clause is zero. Anything you can get now at ordinary cost is worth taking, whether or not you expect to use it.

The reconciliation is that they are talking about different parts of the document and only appear to conflict. Be brief and precise on performance terms, where enforceability is the constraint and length adds nothing. Be thorough on structural terms, where the constraint is future availability rather than enforceability. Most founders do the reverse: they negotiate performance language at length, because it is what the commercial discussion is about, and accept the structural section as boilerplate, which is where the durable value sits.

What none of them contain

None of the three prices enforcement. A term is only worth what it costs to invoke, and in jurisdictions where commercial disputes take years the practical value of most clauses is as a basis for negotiation rather than as a remedy. That does not make them worthless, and it does change which ones matter: a term that lets you stop performing or walk away is worth far more than one that entitles you to damages.

None of them handles the counterparty who will not sign anything. Some suppliers and some customers in some markets operate on relationships and will treat a detailed agreement as an insult, and the honest response is to decide whether the exposure is survivable rather than to insist on a document that ends the conversation.

And one property the ensemble will not produce: negotiating a contract tells you a great deal about how someone will behave. How they respond to a termination clause, whether they read it, whether they push on data, and how they treat a junior person on your side are all information that arrives free during the drafting and is rarely recorded. The document is the smaller output of the process.

The one action that survives the ignorance: before signing, write the list of terms that would be impossible to raise in eighteen months, and check each against the draft. Data, customer ownership, termination, exclusivity. Anything missing is available now at ordinary cost and unavailable later at any cost.

Who has to move

The founder, at the drafting stage rather than at the review, because a lawyer will produce enforceable language and cannot know which structural terms your business will need in year two. The instinct is to treat the legal section as the lawyer’s domain and the commercial section as yours, which leaves the durable half unsupervised. The cheapest first test is the impossible-later list, written in fifteen minutes before the draft comes back, and it usually contains two items nobody had thought to ask for.

Sources and notes

  1. Jeffrey Carpenter and Andrea Robbett, Game Theory and Behavior, MIT Press. Mechanism design and incentive compatibility, and the requirement that a scheme rest on quantities that are observable and verifiable by an enforcing party, are developed alongside contract theory and auctions. Used in section 1 for the bound on what a contract can hold, and for the distinction between terms that decide outcomes and terms that decorate them.
  2. Stefan Thurner, Rudolf Hanel and Peter Klimek, Introduction to the Theory of Complex Systems, Oxford University Press. Path dependence and increasing returns, in which each step raises the cost of departing from a configuration, are developed in the chapters on evolutionary processes. Used in section 2 for the rising cost of introducing a term after a relationship is established, which is a social rather than a physical mechanism but has the same shape.
  3. John D. Sterman, Business Dynamics: Systems Thinking and Modeling for a Complex World, McGraw-Hill, and Donella H. Meadows, Thinking in Systems: A Primer, Chelsea Green Publishing. The overshoot produced when a correction is sized as though the delay between action and consequence were zero is developed in both. Used in section 3 for the swing between light agreements and comprehensive templates, and for the remedy of reviewing agreements that have not failed.
  4. George J. Mailath and Larry Samuelson, Repeated Games and Reputations: Long-Run Relationships, Oxford University Press. The condition under which a continuing relationship enforces good behaviour without a contract, namely that the discounted value of the future exceeds the one-off gain from defecting, is developed throughout. Cited in section 1 for the claim that the relationship is a genuine enforcement mechanism, and for its specific failure mode: it stops working precisely when the counterparty’s horizon shortens.

A note on a number this article does not give. There is no correct contract length and no list of clauses that transfers between jurisdictions and industries. What transfers is the sorting question: for each term, is this enforceable, and could I add it in eighteen months. Those two answers place every clause without any template.

Joshua Agonya Pi’Rwot, Founder.

Lock in your calls.

You’ve marked 0 of 5. Now choose how often you want the signals.

Step 1 · Pick your cadence

The DispatchWeekly · your Monday 5 callsFreealways

Step 2 · Where to send it

Personalize your BriefThe Brief

Tune every edition to the markets and industries you actually act on.

🔒 Unlock personalization — The Brief, $19.99/mo →
Free Dispatch forever · upgrade anytime · we never share your details.
Know where you stand?
The Dispatch tells you what changed. Knowing what to do about it is a different question, and it is the one FounderWise answers. Start with the free Traction Audit: 12 questions, about 3 minutes, scored out of 100.
Find out where you stand →

For teams, syndicates & programs

Recommended
Team
$15/seat · mo
Daily Brief for the whole team (min 3 seats).
  • Everyone on the same signal
  • Admin + shared watch-list
  • One invoice · ~25% off solo
Get Team →
Cohort License
$1,500/cohort
One cohort of up to 30 founders, for accelerators, funds & programs.
  • MVP Studio and GTM Studio for every founder
  • Your logo, your cohort
  • A funder report on what each founder did
Talk to us →
Pass the Dispatch on
Know a founder making these calls blind? Send them this week’s five — free, every Monday.

Decisions, not feeds. · Curated by Joshua Pi’Rwot · FounderWise · Free Audit · Store · parent of Business Growth Accelerator

Call committed. We’ll hold you to it.
Know where you stand →